Weekly Traffic Advisories (May 5) 

Weekly Traffic Advisories (May 5) 
  1. Weekly Traffic Advisories (May 5) 
Note: Each week the local listings are expanded and updated. During the week new and updated tasks are added. Every week a new post is started with fresh info but previous posts may be still valid.   **** Municipal Release

Traffic Delay – Glendale Drive

Location: Glendale Drive from Beaverbank Road to Riverside Drive Date: Monday, May 15 Time: 9 a.m. to 4 p.m.   Work details: This is to facilitate asphalt repair. This project supports the 2021-25 Regional Council Strategic Priorities Plan to establish a safe and accessible integrated mobility network. Traffic impact: Stop-and-go traffic will be in place while work is underway. Motorists should expect delays and are asked to take alternative routes whenever possible. .

Traffic Delay – Osborne Street

Location: Osborne Street from Withrod Drive to Herring Cove Road Date: Friday, May 12 Time: 2 p.m. to 4 p.m. Work details: This work is to facilitate road construction. This project supports the 2021-25 Regional Council Strategic Priorities Plan to establish a safe and accessible integrated mobility network. Traffic impact: Stop-and-go traffic will be in place while work is underway. Motorists should expect delays and are asked to take alternative routes whenever possible. .

Traffic Delay – Wyse Road 

Location: Wyse Road, between Dawson Street & Nantucket Avenue Date: Friday, May 12 Time: 9 a.m. to 4 p.m. Work details: This work is to facilitate borehole drilling on the sidewalks of Wyse Road and Faulkner Street. Traffic impact: A southbound lane drop will be in place on Wyse Road. Motorists should expect delays and are asked to use alternative routes whenever possible. .

Road Construction – Old Sambro Road

Location: Old Sambro Road, from Sussex Street to 191 Old Sambro Road Date: Thursday, May 11 Time: 2-4 p.m.   Work details: Traffic delays will be in place to facilitate road construction. This project supports the 2021-25 Regional Council Strategic Priorities Plan to establish a safe and accessible integrated mobility network. Traffic impact: Stop-and-go traffic will be in place while work is underway. Motorists should expect delays and are asked to take alternative routes whenever possible. .

Traffic Delay – Chain Lake Drive

Location: Chain Lake Drive, from Washmill Lake Drive to Lovett Court Date: Thursday, May 11 Time: 11 a.m. to 2 p.m. Work details: This work is to facilitate road construction. This project supports the 2021-25 Regional Council Strategic Priorities Plan to establish a safe and accessible integrated mobility network. Traffic impact: There will be lane drops in place while work is underway. Motorists should expect delays and are asked to take alternative routes whenever possible. .

Traffic Delay – Dunbrack Street

Location: Dunbrack Street, from Ross Street to Langbrae Drive Date: Thursday, May 11 Time: 9-11 a.m. Work details: Traffic delays will be in place to facilitate road construction. This project supports the 2021-25 Regional Council Strategic Priorities Plan to establish a safe and accessible integrated mobility network. Traffic impact: Lane drops will be in place while work is underway. Motorists should expect delays and are asked to take alternative routes whenever possible. .

Traffic Delay – Montague Road

Location: Montague Road from Montague Mines Road to Serpentine Avenue Date: Thursday, May 11 Time: 7:30 a.m. to 10 a.m. Work details: This work is to facilitate road construction. This project supports the 2021-25 Regional Council Strategic Priorities Plan to establish a safe and accessible integrated mobility network. Traffic impact: There will be lane drops in place, with occasional stop and go traffic while work is underway. Motorists should expect delays and are asked to take alternative routes whenever possible. .

UPDATE: This work will now take place Wednesday, May 10 and Thursday, May 11.

Public Service Announcement Trail Closure – Penhorn Lake Park Trail

Location: Penhorn Lake Park Trail

Date: Tuesday, May 9 and Wednesday, May 10 Wednesday, May 10 and Thursday, May 11

Work details: This work will upgrade the existing stormwater channel into Penhorn Park. The existing stormwater outfall in this location has already been removed and will be replaced with a new stormceptor to help treat the stormwater. A temporary construction easement will be in place for cutting some trees along the alignment for the stormwater channel upgrades.

Traffic impact: The trail will be closed at times to facilitate this work. Users are asked to exercise caution and be aware of barriers, staff, and equipment on site.

.

Traffic Delay – Highway 2

Locations:
  • Highway 2 – Sunnylea Road to Collins Drive (9 a.m. to 11 a.m. only)
  • Highway 2 – Fall River Road roundabout to Rocky Lake Drive (11 a.m. to 1 p.m. only)
  • Highway 2 – Coach Avenue to Holland Drive (1 p.m. to 4 p.m. only)
Date: Wednesday, May 10 Work details:  These delays are a result of ongoing road construction projects in support of the 2021-25 Regional Council Strategic Priorities Plan to establish a safe and accessible integrated mobility network. Traffic impact: There will be lane drops in place, with occasional stop and go while work is underway. Motorists should expect delays and are asked to take alternative routes whenever possible. .

Traffic Delay – Bum Run

Location: Dartmouth Date: Sunday, May 7 Time: 8 a.m. to noon Details: Traffic delays will be in place to facilitate the 2023 Bum Run. Traffic impact: The run will impact:  
  • Sullivan’s Pond
  • Ochterloney Street
  • Crichton Avenue
  • Glen Manor Drive
  • Micmac Boulevard
  • Brookdale Crescent
  • Prince Albert Road
  • Nowlan Street
  • Hawthorne Street
The event will be traffic controlled. Residents should expect delays and are asked to use alternative routes whenever possible. .

Road Construction – Broad Street

Location: Broad Street (north) and Larry Uteck Boulevard

Dates: Tuesday, May 9 to Sunday, July 9

Time: 24/7

Work details: This work is related to the construction of a new roundabout at the intersection of Larry Uteck Boulevard, Brookline Drive (north) and Broad Street (north).

Traffic impacts: Larry Uteck Boulevard will be opened to motorists with local access only to Broad Street (north). Motorists, pedestrians and cyclists will detour to Bluewater Road and Gary Martin Drive. Pedestrian and cyclist access is not permitted through the construction site during active construction.

.

Traffic Delay – Joseph Howe Drive 

Location: Joseph Howe Drive, between Rosemount Avenue and Walton Drive Date: Monday, May 8 Time: 9 a.m. to 4 p.m. Work details: Traffic delays will be in place to facilitate underground utility work. Traffic impact: A lane drop will be in place for southbound traffic. The sidewalk on the west side will be closed. Motorists should expect delays and are asked to use alternative routes whenever possible. .

Traffic Delay – Jubilee Road 

Location: Jubilee Road, between Chestnut and Walnut streets Date: Friday, May 5 Time: 9 a.m. to 4 p.m. Work details: Traffic delays will be in place to facilitate underground utility work. Traffic impact: Stop-and-go traffic will be in place while work is underway. The sidewalk on the south side will be closed. Motorists should expect delays and are asked to use alternative routes whenever possible. .

UPDATE: This work was completed ahead of schedule. Robie Street will reopen as of 6 p.m. on Friday, May 5.

Public Service Announcement Road Closure – Robie Street 

Location: Robie Street (south bound), from Cunard Street to Quinpool Road Dates: Tuesday, May 2 to Friday, May 12 Time: 24/7 Work details: This work is related to the installation of underground infrastructure for the development at 6015 Quinpool Road. Traffic impacts: Motorists, cyclists and Halifax Transit will detour via Cunard, North Park, Trollope and Summer streets and Veterans Memorial Lane. Pedestrians will maintain access via Robie Street sidewalks on the east side of the road (along the Halifax Commons). Halifax Transit will be temporarily closing the three south bound bus stops between Cunard Street and Quinpool Road on the west side of Robie Street. A temporary bus stop will be placed on the south side of Cunard Street between Robie Street and North Park Street. Residents should expect delays and are asked to use alternative routes whenever possible. . **** Halifax Water Release

Wyse Road & Jamieson Street Area – Curb & Sidewalk Reinstatement

On behalf of Halifax Water, ARCP Limited will complete curb and sidewalk reinstatement work in the Wyse Road and Jamieson Street area. This work will take place from 7:00 AM to 5:00 PM beginning Monday, May 8, and continuing for approximately three weeks.

During this work, there will be rolling sections of stop-and-go traffic on:

  • Windmill Road near Jamieson Street
  • Jamieson Street
  • Wyse Road near Jamieson Street
  • Cairn Street
  • Graham Street

Rolling sections of the sidewalk near this work will be closed with pedestrian detours in place.

This work will not impact Halifax Water services in the area.

This is part of the Wyse Road & Jamieson Street Infrastructure Upgrades Project. Learn more at halifaxwater.ca/project/wyse-jamieson-upgrades.

Motorists should expect delays and use alternate routes. Motorists are also reminded that speed fines double in work zones.

We apologize for any inconvenience this necessary infrastructure repair work may cause.

To ensure the safety of our communities and our staff, please maintain a safe distance when Halifax Water staff or contractors are working in your area.

For more information on Halifax Water, please check www.halifaxwater.ca, visit us on YouTube, or Twitter @HalifaxWater, Facebook, or call our Customer Care Centre at 902-420-9287.

. **** Provincial Media Release __ NOTE: For the most up-to-date traffic notices, follow @511ns on Twitter at https://twitter.com/511ns , call 511 or visit: https://511.novascotia.ca/ —————————————— CONTINUING WORK --- CAPE BRETON REGIONAL MUNICIPALITY: Highway 105, North Sydney The intersection of Highway 105 and Tobin Road is reduced to one lane for roadwork until July 31. Traffic control is on-site. Work takes place on weekdays from 7 a.m. to 5:30 p.m. --- COLCHESTER COUNTY: Old Truro Road, Tatamagouche Old Truro Road, from Kennedy Hill intersection to the Cross Road in North River, is closed until further notice due to a large culvert failure. A detour is in place. --- COLCHESTER COUNTY: Salmon River Bridge, Truro Salmon River Bridge, on Highway 102 between exits 14 and 14A, is reduced to one lane northbound until October, due to work on the bridge decking. Traffic control is on-site. Work takes place weekdays from sunrise to sunset. --- COLCHESTER COUNTY: Slade Road, Tatamagouche Slade Road is closed between Lake Road and West Tatamagouche Road until further notice due to a bridge closure. --- CUMBERLAND COUNTY: Apple River Bridge Apple River Bridge, on Shulie Road between Advocate and Joggins, is closed until further notice due to structural damage. Signs and a detour are in place. --- HALIFAX REGIONAL MUNICIPALITY: Highway 102, Bedford/Lower Sackville Highway 102, from Exit 4A to Exit 4C, has lane reductions and intermittent road closures on the northbound and southbound highway for the construction of the Highway 107-Highway 102 Interchange. Highway 102 northbound and southbound, Highway 101, Bedford Highway, Bedford Bypass, Duke Street, Glendale Avenue and Sackville Drive have intermittent road closures for blasting until June 30. Traffic control will be on-site. Road closures for blasting occur between 9 a.m. and 3 p.m., Monday to Thursday, and from 9 a.m. to noon on Friday. Lane reductions occur from sunrise to sunset Monday to Thursday and from sunrise to noon on Friday. -- HANTS COUNTY: Highway 101, Windsor The eastbound off-ramp at Exit 6, Highway 101, is closed for the construction of a new interchange to downtown Windsor. A detour is available via Exit 5A. The off-ramp is closed until September. --- HANTS COUNTY: Hydes Bridge, Lantz Hydes Bridge on Highway 277 is closed until further notice. A detour is in place via Dutch Settlement Road, Elmsdale Road and Trunk 2. Signs are in place. --- LUNENBURG COUNTY: Indian Path Bridge, Bayport Indian Path Bridge, Route 332, is closed for replacement until further notice. A detour is in place. --- PICTOU COUNTY: Highway 104, Barneys River The new Barneys River Interchange will be used to detour Highway 104 traffic until May 31, to prepare for the opening of the new highway. Signs will direct drivers through the roundabouts. Approaching traffic must yield to traffic already in the roundabout. More information on the Highway 104 twinning project can be found at: https://hwy104twinning.ca/ --- RICHMOND COUNTY: Port Royal Bridge, Isle Madame Port Royal Bridge on Port Royal Road is closed until further notice. A detour is in place on MacEachern Road. . NEW WORK --- VICTORIA COUNTY: Highway 105, South Haven Highway 105, from 3.2 kilometres west of Trunk 30, easterly to 600 metres east of Route 312, is reduced to one lane for roadwork until June 30. Traffic control is on-site. Work takes place weekdays from 7 a.m. to 5:30 p.m.