Punch Bowl Drive / Herring Cove Road – Road Surveying

Punch Bowl Drive / Herring Cove Road – Road Surveying
**** Halifax Water Release

Herring Cove Road – Road Surveying

​

From January 12-14 (weather permitting), Thompson Conn will be completing topographic survey work near 123 Herring Cove Road on behalf of Halifax Water. This work will occur between 8:30 AM and 4:30 PM each day and will require lane drops in the work area.

Experienced traffic control personnel will be on-site to manage traffic flows.

Motorists should expect delays and use alternate routes. Motorists are also reminded that speed fines double in work zones.

​.

Punch Bowl Drive – Road Surveying

​

From January 12-14 (weather permitting), Thompson Conn will be completing topographic survey work near 51 Punch Bowl Drive on behalf of Halifax Water. This work will occur between 8:30 AM and 4:30 PM each day and will require lane drops in the work area.

Experienced traffic control personnel will be on-site to manage traffic flows.

Motorists should expect delays and use alternate routes. Motorists are also reminded that speed fines double in work zones.

​

We apologize for any inconvenience this necessary infrastructure improvement work may cause.

​

For the safety of work crews and residents, please observe social/physical distancing requirements (2 metres of separation).

For more information on Halifax Water, please check www.halifaxwater.ca, visit us on YouTube, or Twitter @HalifaxWater, Facebook, or call our Customer Care Centre at 902-420-9287.