Weekly Traffic Advisories (31 July)
Note: Each week the local listings are expanded and updated. During the week new and updated tasks are added. Every week a new post is started with fresh info but previous posts may be still valid
**** Municipal Release
Traffic Delay – Cowie Hill Road
Location: Cowie Hill Road, between Dunbrack Street and Darjeeling Drive
Date: Thursday, Aug. 6
Time: 9 a.m. to 4 p.m.
Work details: This is to facilitate road repair work in support of the Moving Better goals outlined in the 2026–2030 Strategic Plan.
Traffic impact: There will be stop-and-go traffic in place while this work is underway. Drivers should expect delays and are asked to use alternative routes where possible
.
Traffic Delay – Intersection of Spring Avenue and Portland Street
Location: Intersection of Spring Avenue and Portland Street
Date: Tuesday, Aug. 4
Time: 9 a.m. to 2 p.m.
Work details: This is to facilitate traffic control setup in support of the Moving Better goals outlined in the 2026–2030 Strategic Plan.
Traffic impact: Stop-and-go traffic and an altered centreline will be in place while work is underway. Drivers should expect delays and are asked to use alternative routes where possible.
Sidewalk impact: Traffic control personnel will be on site to direct people walking or rolling.
.
Traffic Delay – Glendale Drive
Location: Glendale Drive, from Riverside Drive to Pinehill Drive
Date: Tuesday, Aug. 4
Time: 9 a.m. to 4 p.m.
Work details: This is to facilitate road repairs in support of the Moving Better goals outlined in the 2026–2030 Strategic Plan.
Traffic impact: Stop-and-go traffic will be in place while work is underway. Drivers should expect delays and are asked to use alternative routes where possible.
.
Traffic Delay – Kearney Lake Road
Location: Kearney Lake Road, from Dunbrack Street to Bedford Highway
Date: Monday, Aug. 3 to Friday, Aug. 7
Time: 8 p.m. to 5 a.m. (overnight work)
Work details: This is to facilitate road repairs in support of the Moving Better goals outlined in the 2026–2030 Strategic Plan.
Traffic impact: An altered centreline will be in place while work is underway. Drivers should expect delays and are asked to use alternative routes where possible.
.
Traffic Delay – Hammonds Plains Road
Location: Hammonds Plains Road, from Kingswood Drive to Gary Martin Drive
Dates: Monday, Aug. 3 until Friday, Aug. 7
Time: 7 p.m. on Monday until 6 a.m. on Friday (overnight)
Work details: This is to facilitate the installation of underground infrastructure.
Traffic impact: Stop-and-go traffic will be in place while work is underway. Drivers should expect delays and are asked to use alternative routes where possible.
.
Traffic disruptions in support of the Bayers Road Transit Priority Corridor Phase 2 project
The Halifax Regional Municipality is advising residents of upcoming traffic disruptions along Bayers Road, between Connaught Avenue and Windsor Street.
These disruptions are required to facilitate construction of the Bayers Road Transit Priority Corridor Phase 2 project, which is expected to begin during the week of Aug. 4, 2026, and will continue throughout construction seasons, for approximately two years.
Work details: This project is part of the municipality’s Integrated Mobility Plan, Rapid Transit Strategy and supports the Moving Better goals outlined in the 2026–2030 Strategic Plan. Work will include:
Repaving the street and replacing curbs and sidewalks to improve safety, accessibility, and connectivity for all road users
Construction of dedicated transit lanes and intersection upgrades to improve transit reliability and support transit priority
Coordinated underground utility upgrades in partnership with Halifax Water, reducing future disruptions and sharing construction costs
Design considerations to support future high‑capacity transit, including proposed bus rapid transit service
Traffic impact: Traffic impacts are expected throughout the duration of the project. The standard traffic configuration will include an inbound lane detour, along with additional impacts as required during specific phases of work:
Inbound lane detour: In place for most of the project timeline, this section of Bayers Road will be open to outbound traffic only. Inbound traffic will be directed along clearly marked detour routes.
Planned road closures: Some stages of the work will require short-term full road closures within the project area to ensure the safety of residents, road users and construction crews.
Local and emergency access will be maintained at all times.
Planned road closures and any other changes to traffic patterns will be communicated in advance. Drivers should expect delays and are encouraged to use alternative routes where possible.
Sidewalk impact: Sections of sidewalks will be closed in the work area as construction progresses. Access to local properties and businesses maintained.
Transit impact: Routes 1, 8, 192, 194, 196 and outbound trips on Route 330 have been altered in advance of this project. Stops will not be serviced along Bayers Road, between Connaught Avenue and Windsor Street. Temporary stops will be in place along Connaught Avenue, Almon Street and Windsor Street.
For complete Halifax Transit detour information, including maps, please visit our website.
For more information about this project, visit: halifax.ca/bayersroad
.
Traffic disruptions in support of Sackville Drive repaving and maintenance work
The Halifax Regional Municipality is advising residents of upcoming traffic delays on Sackville Drive, between Beaver Bank Road and Florence Street.
These traffic delays are required to facilitate road maintenance and infrastructure work as part of the Sackville Drive repaving and maintenance project. Work is expected to begin in the coming weeks and is anticipated to be completed in fall 2026.
Time: 7 a.m. to 4 p.m. for weekday work and 6 p.m. to 7 a.m. for weeknight work
Work details: This project includes coordinated road maintenance and infrastructure improvements designed to enhance safety, accessibility and long-term road conditions, including:
Repairs and replacements of concrete sidewalks, curbs and driveway connections
Concrete repairs and maintenance at transit stops
Adjustments to manholes and water valves in the street
Milling (removing) the top layer of worn asphalt
Spot repairs to the asphalt base layer
Repaving with new asphalt
Repainting pavement markings and crosswalks
Landscaping
This work aligns with the Moving Better goals outlined in the 2026–2030 Strategic Plan.
Traffic impact: Traffic impacts are expected throughout the duration of the project and may include the following:
Weekday impacts: Two-way traffic will be maintained throughout this project with a lane reduction in place. This is expected to be the standard daytime traffic impact during this project.
Weeknight impacts: Two-way traffic will be maintained throughout this project with an altered centreline in place. This is expected to be the standard overnight traffic impact during this project.
Local, business and emergency access will be maintained at all times.
Work on concrete driveway connections will be done in sections, so each impacted property will always have access. When work is happening on one part of a driveway, another part will remain open, or an alternate access point will be available.
Drivers should expect delays and are asked to use alternative routes where possible.
Sidewalk impact: Sections of sidewalks will be temporarily closed as work progresses. Marked detours will be in place.
Access to the Sackville Greenway Trail and the Sackville Public Library will be maintained during this work.
Transit impact: There will be short-term closures of Halifax Transit bus stops as replacement and repair work progresses. Visit our website for up-to-date impacts to Halifax Transit routes and bus stops.
For more information about this project, visit: halifax.ca/sackvilledrive
.
Traffic disruptions in support of Hammonds Plains Road repaving and maintenance work
The Halifax Regional Municipality is advising residents of upcoming traffic delays on Hammonds Plains Road between civic 1220 Hammonds Plains Road and Gary Martin Drive.
These traffic delays are required to facilitate road maintenance and infrastructure work in this area, which will begin Thursday, July 16 and are anticipated to be completed Friday, August 14.
Time: 7 p.m. to 6 a.m. (weeknights)
Work details: This project includes coordinated road maintenance and infrastructure improvements designed to enhance safety, accessibility and long-term road conditions, including:
Adjustments to manholes and water valves in the street
Milling (removing) the top layer of worn asphalt
Repaving with new asphalt
Repainting pavement markings and crosswalks
Shouldering, minor landscaping and driveway connection work
This work aligns with the Moving Better goals outlined in the 2026–2030 Strategic Plan.
Traffic impacts: Traffic impacts are expected throughout the duration of the project and may include the following:
Weekday impacts: The entirety of the project will be during weeknights and weekends only.
Weeknight impacts: 7 p.m. to 6 a.m. weeknights. A mix of stop-and-go and altered centre lines will be utilized to help maintain efficient traffic flow and to minimize disruption. This is expected to be the standard overnight traffic impact during this project.
Weekend work: 8 a.m. to 7 p.m.
Local access and emergency access will be maintained.
Drivers should expect
delays and are asked to use alternative routes where possible.
.
Traffic disruptions in support of Jubilee Road repaving and maintenance work
The Halifax Regional Municipality is advising residents of upcoming traffic delays on Jubilee Road, between Oxford Street and Bloomingdale Terrace.
These traffic delays are required to facilitate road maintenance and infrastructure work in this area, which will begin in mid-late July and are anticipated to be completed in late August 2026.
Time: 9 a.m. to 4 p.m. for weekday work and 7 p.m. to 6 a.m. for weeknight work
Work details: This project includes coordinated road maintenance and infrastructure improvements designed to enhance safety, accessibility and long-term road conditions, including:
Spot repairs to concrete curbs
Adjustments to manholes and water valves in the street
Milling (removing) the top layer of worn asphalt
Repaving with new asphalt
Repainting pavement markings and crosswalks
Minor landscaping and driveway connection work
This work aligns with the Moving Better goals outlined in the 2026–2030 Strategic Plan.
Traffic impacts: Traffic impacts are expected throughout the duration of the project and may include the following:
Weekday impacts: From 9 a.m. to 4 p.m., there will be a mix of stop-and-go traffic and two-way traffic in the work area. Traffic signals at the intersection of Oxford Street and Jubilee Road will not be turned off during weekday work. These are expected to be the standard daytime traffic impacts during this project.
Weeknight impacts: Stop-and-go traffic will be maintained to minimize disruption. This is expected to be the standard overnight traffic impact during this project.
Weekend work: Some locations may require weekend work to minimize daytime traffic impacts.
Local access and emergency access will be maintained at all times.
Drivers should expect delays and are asked to use alternative routes where possible.
Sidewalk impact: Sidewalks are expected to remain open throughout this project.
.
Traffic disruptions in support of Nantucket Avenue repaving and maintenance work
The Halifax Regional Municipality is advising residents of upcoming traffic delays on Nantucket Avenue, between Wyse and Victoria roads.
These traffic delays are required to facilitate road maintenance and infrastructure work in this area, which will begin in mid-July and are anticipated to be completed in September 2026.
Time: 7 p.m. to 6 a.m. for weeknight work and 8 a.m. to 7 p.m. for weekend work
Work details: This project includes coordinated road maintenance and infrastructure improvements designed to enhance safety, accessibility and long-term road conditions, including:
Spot repairs to concrete curbs
Adjustments to manholes and water valves in the street
Milling (removing) the top layer of worn asphalt
Repaving with new asphalt
Repainting pavement markings and crosswalks
Minor landscaping and driveway tie-ins
This work aligns with the Moving Better goals outlined in the 2026–2030 Strategic Plan.
Traffic impacts: Traffic impacts are expected throughout the duration of the project and may include the following:
Weeknight impacts:
Two-way traffic will be maintained throughout most of the work, with lane reductions in place as required.
Stop-and-go traffic may be necessary at times to safely accommodate specific construction activities.
These measures are expected to be the primary traffic impacts associated with the project and are intended to minimize disruptions and avoid full road closures whenever possible.
Weekend work: Some locations may require weekend work to minimize daytime traffic impacts.
Access to and from the Macdonald Bridge via Nantucket Avenue will be maintained at all times.
Emergency access, local access and access to the Zatzman Sportsplex will be maintained at all times.
Drivers