Weekly Traffic Advisories (5 June) 

Weekly Traffic Advisories (5 June) 

Weekly Traffic Advisories (5 June) 

Note: Each week the local listings are expanded and updated. During the week new and updated tasks are added. Every week a new post is started with fresh info but previous posts may be still valid

**** Municipal Release

Upcoming traffic disruptions in support of Windsor Street repaving and maintenance work

The Halifax Regional Municipality is advising residents of upcoming traffic delays on Windsor Street, between North and Almon streets to facilitate road maintenance and infrastructure work in this area. Work will begin in mid-June and is anticipated to be completed by late July.

Time: 9 a.m. to 4 p.m. for weekday work and 7 p.m. to 6 a.m. for weeknight work

Work details: This project includes coordinated road maintenance and infrastructure improvements designed to enhance safety, accessibility and long-term road conditions, including:

  • Spot repairs to concrete curbs
  • Adjustments to manholes and water valves in the street
  • Milling (removing) the top layer of worn asphalt
  • Repaving with new asphalt
  • Repainting pavement markings and crosswalks
  • Minor landscaping and driveway tie-ins

This work aligns with the Moving Better goals outlined in the 2026–2030 Strategic Plan.

Traffic impact: Traffic impacts are expected throughout the duration of the project and may include:

  • Weekday impacts: Two-way traffic will be maintained with an altered centreline in place. This is expected to be the standard daytime traffic impact during the project.
  • Weeknight impacts: Stop-and-go traffic will be maintained to minimize disruption and avoid full road closures. This is expected to be the standard overnight traffic impact during the project.
  • Weekend work: Some locations may require weekend work to minimize daytime traffic impacts.

Local access and emergency access will be maintained at all times.

Drivers should expect delays and are asked to use alternative routes where possible.

Transit impact: Visit our website for up-to-date impacts to Halifax Transit routes and bus stops.

Active transportation impact: Bike lanes in this area will be temporarily closed while this work is underway.

.

Road Closure – Waverley Road

Location: Waverley Road, between civics 1291 and 1335

Dates and times: From 7 p.m. on Thursday, June 11 to 7 a.m. on Monday, June 15 (weather dependent)

Work details: This is to facilitate temporary utility pole and line relocations in coordination with Nova Scotia Power, in support of the Waverley Road guiderail and retaining wall project.

Traffic impact: This section of Waverley Road will be closed while this work is underway. Drivers should expect delays and are asked to use alternative routes where possible. Local access will be maintained from both ends of the closure, and emergency access will be maintained at all times.

.

Traffic Delay – Parkland Drive

Location: Parkland Drive, between Kearney Lake Road and Farnham Gate Road

Date: Wednesday, June 10

Time: 7 a.m. to 6 p.m.

Work details: This is to facilitate natural gas pipeline installation.

Traffic impact: Two-way traffic will be maintained in both directions while work is underway. Drivers should expect delays and are asked to use alternative routes where possible.

Sidewalk impact: The sidewalk will be closed to pedestrians. Detour signage will be in place.

.

Traffic Delay – Joseph Zatzman Drive

Location: Joseph Zatzman Drive, between Akerley Boulevard and Wright Avenue

Date: Tuesday, June 9

Time: 9 a.m. to 7 p.m.

Work details: This is to facilitate road repair work in support of the Moving Better goals outlined in the 2026–2030 Strategic Plan.

Traffic impact: Two-way traffic will be maintained with an altered centreline in place while this work is underway. Drivers should expect delays and are asked to use alternative routes where possible.

.

Traffic Delay – Cobequid Road

Location: Cobequid Road, from Glendale Avenue to Sucker Brook Road

Date: Tuesday, June 9

Time: 9 a.m. to 4 p.m.

Work details: This is to facilitate road repairs in support of the Moving Better goals outlined in the 2026–2030 Strategic Plan.

Traffic impact: Stop-and-go traffic will be in place while work is underway. Drivers should expect delays and are asked to use alternative routes when possible.

.

Traffic Delay – Intersection of Bedford Highway and Holland Avenue

Location: Intersection of Bedford Highway and Holland Avenue

Date: Saturday, June 6

Time: 8 a.m. to 5 p.m.

Work details: This is to facilitate road repairs in support of the Moving Better goals outlined in the 2026–2030 Strategic Plan.

Traffic impact: Lane drops and stop-and-go traffic will be in place during work. The traffic lights at the intersection will be shut down between 8 a.m. to 5 p.m. Drivers should expect delays and are asked to use alternative routes when possible.

Active transportation impact: The bike lane on the Bedford Highway will be closed from Shore Avenue to High Street during work.

.

Traffic Delay – Windmill Road

Location: Windmill Road, near 333 Windmill Road

Date: Monday, June 8

Time: 9 a.m. to 4 p.m.

Work details: This is to facilitate road repair work in support of the Moving Better goals outlined in the 2026–2030 Strategic Plan.

Traffic impact: There will be an altered centreline in place while work is underway. Drivers should expect delays and are asked to use alternative routes where possible.

Sidewalk impact: The sidewalk will be closed on the west side of Windmill Road

.

Traffic Delay – Intersection of Brunswick Street and Spring Garden Road

Location: Intersection of Brunswick Street and Spring Garden Road

Date: Monday, June 8

Time: 9 a.m. to 4 p.m.

Work details: This is to facilitate Dalhousie Plaza Landscaping in support Brunswick Street Complete Streets project.

Traffic impact: An altered centreline will be in place while work is underway. Drivers should expect delays and are asked to use alternative routes where possible.

Pedestrian impact: The north sidewalk of Spring Garden Road will be closed from Brunswick to Queen streets. Marked detours will be in place. Sidewalk users should expect delays and are asked to use alternative routes where possible.

.

Traffic Delay – Joseph Howe Drive

Location: 3824 Joseph Howe Drive

Date: Monday, June 8

Time: 6 p.m. to 5 a.m.

Work details: This is to facilitate street restoration.

Traffic impact: Two-way traffic will be maintained while work is underway. Drivers should expect delays and are asked to use alternative routes where possible.

Pedestrian impact: The sidewalk will be closed while work is underway. The south side sidewalk will remain open. A marked detour will be in place.

.

Traffic Delay – Cow Bay Road

Location: Cow Bay Road, from Shore Road to Oceanlea Drive

Date: Saturday, June 6

Time: 8 a.m. to 7 p.m.

Work details: This is to facilitate asphalt repairs in support of the Moving Better goals outlined in the 2026–2030 Strategic Plan.

Traffic impact: Stop-and-go traffic will be in place. Drivers should expect delays and are asked to use alternative routes when possible.

.

Traffic Delay – Waverley Road

 Location: Waverley Road between civics 1268 and 1355

Date: Monday, June 8 to Thursday, June 11

Time: 7 a.m. to 6 p.m.

Work details: This is to facilitate preparation work in support of the Moving Better goals outlined in the 2026–2030 Strategic Plan.

Traffic impact: Lane drops and stop-and-go traffic will be in place during work. Drivers should expect delays and are asked to use alternative routes when possible.

.

Traffic Delay – Windsor Junction Road

Location: Windsor Junction Road, between Windgate Drive and Cobequid Road

Date: Sunday, June 7 to Monday, June 8

Time: 7 p.m. to 6 a.m.

Work details: This is to facilitate track maintenance on the level crossing near 99 Windsor Junction Road, in support of the Moving Better goals outlined in the 2026–2030 Strategic Plan.

Traffic impact: The track crossing will be fully closed overnight. Local access to homes and businesses will be permitted. Drivers should expect delays and are asked to use alternative routes where possible.

.

Traffic Delay – South Street

Location: South Street, between Barrington and Hollis streets

Date: Saturday, June 6 and Sunday, June 6

Time: 8 a.m. to 5 p.m.

Work details: This is to facilitate utility connections for a nearby development.

Traffic impact: This section of road will be closed while work is underway. A marked detour will be in place. Drivers should expect delays and are asked to use alternative routes where possible.

Pedestrian impact: The north side sidewalk will be closed while work is underway. The south side sidewalk will remain open. Sidewalk users should expect delays and are asked to use alternative routes where possible.

Transit impact: Halifax Transit will be detoured, but no bus stops will be impacted.

.

Traffic Delay – Heathside Crescent

Location: Civic address 66 Heathside Crescent

Date: Tuesday, June 9

Time: 9 a.m. to 4 p.m.

Work details: This is to facilitate natural gas service installation.

Traffic impac